Hello everyone,

on Saturday we might buy a plot of land – and they are really rare here.
Disadvantage (or however you see it): it is a rear building plot, or a very far back plot. The driveway is about 35 meters, and to the house probably around 40 meters.
Quick question: WHO has a similar plot and can tell me how high the costs (especially the earthworks) are for such a long access way? Surely connection costs are variable / connections anyway... but I would be enormously grateful for a rough estimate, because I have no idea at all.

Thanks, thanks!!!
 

Legurit

2016-06-14 20:26:07
  • #2
We have similar conditions... for sewage, water, and electricity we paid 8,675 €. The telephone is always the same price (Telekom), we don’t have gas. Sewage is, of course, only partly due to the length. We are doing the driveway so that we only pave the first 12 m (60 sqm) and then lead only a footpath to the house. We want to use the driveway and are currently planning a greenhouse. In case of emergency, you should be able to drive through the carport to the house (our driveway is 5 m wide).
 

Inga123

2016-06-14 20:43:11
  • #3
Oh, thank you very much for the response! Are the earthworks and everything included? All shafts, sewer pipes, cables, etc. - sorry, I am still at the very beginning - and no one can really estimate that. How many meters is it from the connection to the house? And did completely new connections have to be made? I’m just surprised that many people with a much shorter driveway had to pay about the same. The idea of paving is not bad.
 

Lenza

2016-06-14 20:49:41
  • #4
Hi. We are facing a similar problem. From the still fictional house to the street is about 42m (there are 2 more houses before us). Estimated development costs: 32k. We are building in Berlin.
 

Legurit

2016-06-14 20:51:43
  • #5
Yup - everything included. You can ask the municipality or the utility providers for the exact prices - it's usually per meter. With wastewater it wasn't quite... that reminds me, I still forgot that part from the municipality: €3636 - but that had nothing to do with the length, just with opening and closing the street.

So overall €11316 + €694 construction electricity + €600 telecom (of which you get back €400 depending on the contract)

I think we had 42 m.

: what do you count as development? Of course, if you have to dig up a highway it might be more expensive.
 

Inga123

2016-06-14 20:52:02
  • #6
Hello Lenza,

32000€??? Then we can forget the whole thing quickly... can you roughly tell me what makes up the price?
 

Similar topics
07.10.2014Renounce Telekom connection30
01.01.2016Cost of house connection for Kabel Deutschland and Telekom?37
30.05.2016Apply for Telekom / Unity Media connection in parallel11
16.07.2016Telekom connection - line already laid, still have to pay 600€?29
08.08.2016Connection costs for telecom, cable, electricity10
01.02.2017Duration of completion notification for Telekom house connection22
05.02.2017Land costs? What is included?13
14.01.2018Kabel Deutschland or Telekom or both14
10.01.2018Telekom says TV is not possible - Can that really be true?29
20.02.2018Telekom home connection, your experiences. Is Magenta M okay?43
06.11.2018House connection: Telekom does not want to drill through the white tank17
05.12.2018Dispute between telecom and municipal utilities - house connection10
11.04.2021Plan a conduit for Telekom?21
12.11.2020Internet connection: Deutsche Telekom vs. cable network33
30.03.2020Telekom FTTH - What is needed?30
03.01.2021Problems with Telekom. Crossed cable?33
19.02.2021Telekom Hybrid or Vodafone Cable - Advantages & Disadvantages for Internet36
04.01.2022Cable vs. Telecom Fiber Optic - Decision56
02.12.2022Creation of the house connection by Telekom15
11.03.2023Fiber optic expansion by 1&1 or Telekom - Who pays for the construction trenches?20

Oben