When did you install the front door?

  • Erstellt am 2016-05-25 08:02:28

Tommes78

2016-05-25 08:02:28
  • #1
Hello, I have a question. When was the front door installed at your place? The background is that we are building with a general contractor (GU) and have removed the front door because we want an aluminum door. The GU only offers wooden doors. We start construction on Monday and our GU said that we should order the front door now so that it can be installed in 5 weeks (completion of the shell construction). Now that I've thought about it, I wonder if that makes sense? Installing the new door so early? I mean, many craftsmen will still be coming and going and apart from the shell, nothing else is done yet. Therefore, the question is whether it is common for a front door to be installed so early. I have also often seen that initially only the frame of the actual front door is set and the door leaf is temporarily replaced with a rough construction door. How was it with you?
 

Teyla

2016-05-25 08:56:42
  • #2
Hi,

we also removed doors and windows and procured them elsewhere.
In our case, the front doors were installed at the same time as the windows (after completion of the shell construction), but without the final door panels (in their place was a simple wooden board).

The real door panels were only installed once the construction work was finished, so that no damage would occur beforehand.

In any case, doors and windows must be installed before starting with the installations, so that the house can be locked. There are plenty of thieves who move from site to site and plunder the materials!
 

Tommes78

2016-05-25 09:04:01
  • #3
Ok, thanks that means the actual door frame + possibly side panel has already been installed by you and then a wooden infill instead of the actual door.
 

Sebastian79

2016-05-25 09:21:43
  • #4
We received the front door shortly before the screed was laid - before that, a construction door was installed.

Nevertheless, unfortunately, we now have a dent in the frame - luckily, it is hardly noticeable.

You can also work the screed onto the door afterwards and thus wait until just before the tiling, but that is also patchwork and requires increased coordination of the construction work.

I would lock the door, cover it with foil, and assign the craftsmen another entrance (if possible).
 

Tommes78

2016-05-25 09:25:40
  • #5
Another way will not work for us, then you would always have to slide down the entire slope

Ok, but if I understand correctly, then I would have the frame of the door + side panel installed first (kept well packed) and replace the actual door leaf with a construction wood door. Right? I would rather not have the real door installed yet, because I also think too much can still happen.
 

Sebastian79

2016-05-25 09:26:56
  • #6
Yes, that's how I would do it too. However, you still won't be able to prevent someone from hitting it - unfortunately, that can always happen.
 

Similar topics
30.08.2015Front door: 3- or 5-point locking without automatic locking system?14
27.05.2015Front door made of natural oak?11
24.09.2015Which windows and doors are recommended?21
01.12.2020Front Door Equipment and Costs / Prices25
23.03.2016Front door, manufacturer?, affordable23
11.02.2016Windows / Doors / Wardrobe13
26.01.2021Front door - plastic or aluminum56
28.07.2018Did you have RC2 windows installed?63
18.09.2016Window/facade/garage paint - something different18
29.11.2016Front door only burglary protection / better materials - plaster, screed?10
13.07.2017Which personal contribution is worthwhile in house construction?39
25.07.2017Additional costs for anthracite for windows, front door, and garage door?21
18.08.2017Bluntly closing doors - left or right stop!?32
25.11.2021Getting rid of moisture from the shell construction - how to ventilate and other topics18
07.02.2022New construction security options for windows and front doors37
24.08.2022Dark floor, light doors: does that clash?29
11.09.2022The front door with automatic locking is difficult to open.15
28.07.2023Screed has been in for three days and is still wet?52
27.11.2023Assessment of costs for the shell construction and total costs (plaster, screed)17