What costs can we expect?

  • Erstellt am 2010-07-04 11:51:09

Langis

2011-02-11 10:25:37
  • #1
@Holzwurm30

The heating and electrical installations are done by professionals. Each a master craftsman who is also authorized to approve the work.
And who are also part of the family

The insulation work should preferably be done by people who are best from Allkauf Haus, because of warranty etc. I completely agree with you.

By interior finishing I generally only mean the things that can be done yourself with some manual skills. Not the work that must be approved by professionals anyway.
For example, I also have the screed done. If you have ever dealt with screed yourself, you know how long something like that can take.

Since we will have underfloor heating throughout the entire house, the amount of screed will be somewhat reduced. The buffer of €5000 was planned for these works. I will receive exact prices next week. Then I can say more whether this buffer will be sufficient.

Laying the water and gas connection from the street into the house costs about €1500 at the city. That’s what I was told, I can’t say much more about it now.
 

Interessent

2011-02-27 22:48:44
  • #2
I also recently inquired here on the forum about prices for the construction of a turnkey single-family house. I was given much higher figures. Yours are so low, it's almost unbelievable. But I only got my information from conversations with representatives who work for prefab house companies. I already had a strange feeling about that and couldn't quite believe it. In any case, it's interesting to hear a completely different perspective.
 

R1zbear

2011-03-14 10:03:54
  • #3
If one were to have the approximately same house built in solid construction, one would easily be 100,000€ over, if that is even enough.
 

Langis

2011-05-14 09:55:37
  • #4
In the meantime, we have decided to move away from Allkauf House and have actually ended up back with the solid house. There is hardly any difference in price. I have to take back my own statement from a few months ago. (Allkaufkosten mal ganz genau untereinander schreiben und nachhaken) In addition, the craftsmen can be chosen themselves, trades that can be done by oneself will be done in-house. Things that should be done by professionals will then be done by professionals. The first groundbreaking is planned for mid-June.

Best regards
 

Similar topics
10.09.2010Does Allkauf Haus offer a full basement for 9999€?!18
14.05.2016Allkauf house financing condition50
29.01.2014Cost saving/basement/affordable tiles/sealed screed?13
08.05.2014Most moisture from screed?25
10.05.2015Screed uneven - defect removal refused52
10.08.2015In which season of the year is it best to bring screed into the basement10
13.04.2017Screed with gold sand17
28.04.2016Order screed - plaster14
27.05.2016Plastic fittings/water pipes and insulating underfloor heating beneath screed?40
07.08.2016Upper floor without screed - only concrete floor15
08.06.2016Questions about underfloor heating - new subfloor/screed/granite tiles14
31.07.2016Screed does not extend into the reveals at windows / terrace doors on the ground floor12
29.07.2018Perimeter insulation under the floor slab and still XPS under the screed?28
24.04.2017First variable loan, then construction financing?11
31.05.2022Cancellation of the installation appointment at Allkauf Haus - costs or compensation?36

Oben