What are the first steps

  • Erstellt am 2013-05-15 10:54:48

wombel007

2013-05-15 10:54:48
  • #1
Hello everyone,

I would like to first say something about my situation. It looks like I will be building on my parents' property. I have received money and only need to borrow a maximum of €100,000 additionally. My father bought a small garden next to the front yard property, which is building land. The house can have a size of about 10x12m, minus all distance requirements from the street and neighbors. I have the following problem: I don't know where to start and what to apply for where, and what the best course of action is. I want a small house with a first floor and an attic; it should also have a basement. I am leaning towards a prefabricated house. What do I have to do first, go to the building authority and submit a building application, or first go to a prefabricated house company to determine the size and type of house? Only after that can I apply for my financing, right?

Another problem is that I don't know whether I should choose a prefabricated house made of stone or a solid construction made of wood or something else?

Can someone tell me how it works with the basement? Can the prefabricated house company commission it, or do I need an architect?

Thanks for your info
 

Bauexperte

2013-05-15 11:33:01
  • #2
Hello,


Nobody can take that decision for you either; it is usually a gut feeling.


Both are possible. Usually, the prefab house providers have fixed basement builders they cooperate with.

Rhine regards
 

Similar topics
01.03.2011Cost of architect services for prefabricated house13
30.05.2012Massive house costs KFW 70 - Prefabricated house65
27.02.2013Turnkey prefabricated house - total price okay?59
26.12.2012Prefabricated house / solid house, which construction companies?16
27.05.2013Cost estimation: prefabricated house, basement, carport, single garage10
02.09.2013Which heating system for prefab houses: air source heat pump, geothermal, solar, photovoltaic17
05.07.2013Solid house or prefabricated house? Which suits us better?18
25.06.2014Financial requirements for building a prefabricated house55
12.08.2014Construction method: Prefabricated house Solid house Construction supervisor Architectural planning18
22.02.2015Solid house vs. prefabricated house12
17.09.2015Build a house - It should be a prefabricated house12
11.02.2017Prefab house - yes or no?95
21.02.2017Renovate the core of the old house or build a prefab house?16
23.11.2024Build a prefabricated house over an old existing basement?18
16.09.2018Demolition of prefabricated house - Who has experience with demolishing houses?24
07.09.2018160m2 detached house in timber frame construction on the north slope with basement100
16.12.2021Which prefabricated house provider - prices, experiences?212
10.09.2020Bought an old cellar. Does it only carry wooden studs or also solid construction?17
19.10.2020Street about 50cm above the property - backfill or basement24
09.06.2021House construction planning: solid house or prefabricated house? With or without a basement?80

Oben