We want to build a house and have basic questions

  • Erstellt am 2014-10-01 12:18:41

f-pNo

2014-10-02 08:43:20
  • #1
Hello Steve,

YOU might want to reconsider and calculate again with a sharp pencil.

You are planning 130,000 euros for the shell construction. The planning of the house as well as the tendering is supposed to be done by the architect. No idea if I am estimating it too high, but I think about 30,000 euros will be needed for that. A closed shell construction means to my knowledge: earthworks, foundation slab, raised walls, roof frame, roof covering, windows. I have probably forgotten something. For that, the remaining 100,000 euros for a 130 sqm house could already be tight – depending on the soil (you should plan for a soil report) and the associated earthworks. Whether the 100,000 euros will be enough can maybe be better assessed by others here.

From here on, you + friends/family want to continue building yourselves. Apart from the fact that they can only help after their regular work or on weekends (which will make the construction time drag out) – you will save labor costs through this help. By the way, the BG Bau (accident insurance) will definitely be due here. But you still need all the materials! Insulation, cables, switches and sockets, interior doors, heating + radiators or loops, pipes for water/sewage, bathroom equipment, screed, interior plaster, tiles, painting materials, drywall, etc. pp. – I have certainly forgotten half of it.

How do you want to finance this?
 

Similar topics
14.11.2011Shell construction still this year15
05.09.2015Cracks in masonry (shell construction)14
13.02.2014Mold on wood/ shell construction, is it possible to deduct the advance payment invoice?28
24.04.2015Buy tiles during shell construction24
09.03.2015Received an offer from a builder: Cost of shell construction - experiences?26
27.02.2015Purchase shell construction and complete it including financing15
11.02.2016Cost per cubic meter of built-up shell space14
07.05.2016Buying a shell construction - Experiences21
03.10.2016Single-family house, hillside location, basement half residential/useful area - expensive shell construction?15
20.04.2017Payment plan with 35% after the shell construction, okay?10
05.05.2017Rough construction flat-rate offer - forgotten necessary items11
06.09.2017Add a wind catch later to the shell construction17
07.10.2017From when must the shell construction be dry or sealed?16
18.12.2017Offers for single-family house shell construction and basement received - your assessment?21
31.01.2022Possible savings in self-performed structural work37
27.08.2018New building shell construction selection: Choose a company or architects?52
14.07.2019Costs for the shell construction of an office building16
27.11.2023Assessment of costs for the shell construction and total costs (plaster, screed)17
28.03.2024Offer for shell construction of a single-family house 170 sqm - Is the price market-appropriate?57
24.02.2025Construction Costs Shell/Turnkey Comparison39

Oben