So maybe I am misunderstanding it, but isn't it about the time between ordering windows and their installation? During that time, I would at most prepare electrical and plumbing (chasing, etc.) But before the shell construction is lockable, I wouldn't install anything and, moreover, wouldn't leave any equipment on the construction site. Also, the "classic hiding place" for the key to the construction site door in the construction power box is not recommended. In our construction area of 10 sites, there have been two break-ins/thefts. Once, the key was left in the construction power box. At our shell construction (I didn't even count that), two empty cases of beer were even taken.