Laurasstern
2020-02-25 20:19:28
- #1
sorry OT: I have opened my own thread about our botched mini house (80 m2 basement, 50 m2 ground floor, 50 m2 upper floor, all built-up area). For the shell construction + excavation 250,000 EUR in Vienna.
Don’t be upset, but I really wonder how someone in their early 30s with two small children can easily finance over half a million plus additional incidental costs? But maybe there is a lot of parental support We are both over 50, have 3 children, soon 50% own funds of the total construction sum, but such a high amount would have been too risky for us.
Don’t be upset, but I really wonder how someone in their early 30s with two small children can easily finance over half a million plus additional incidental costs? But maybe there is a lot of parental support We are both over 50, have 3 children, soon 50% own funds of the total construction sum, but such a high amount would have been too risky for us.