Severe weather warning tomorrow, red level for our construction area!

  • Erstellt am 2018-05-12 21:13:28

Nordlys

2018-05-14 20:28:27
  • #1
He was still too soft for heavy rain, that's why he is now lumpy. The fine material was washed away, the pebbles remained. But the binder is cement. That hasn't been washed out. Definitely not. Now just wait and see how hardened it looks. Whether you need to add something on top, or if Estrichwilly can even it out. Today you can't do anything anyway.
 

Otus11

2018-05-14 22:13:21
  • #2


Why doesn't the esteemed foundation slab construction manager then protect his work from such exposure, for example with tarps?
 

Egon12

2018-05-14 22:13:22
  • #3
You generally can't do anything or are you the site manager? Let the professionals handle it... that's what warranties are for.

Otherwise, a well-meaning piece of advice, relax or you'll come out 20 years older from your house construction, these are just minor issues.
 

HilfeHilfe

2018-05-15 06:54:58
  • #4
Keep us updated!
 

KingSong

2018-05-15 12:53:36
  • #5
UPDATE:

The surface doesn't look too bad, it’s not winning any beauty awards but oh well.

What I saw after removing the formwork I like less. As a layman, I can’t judge whether this is still okay, especially at the corner, but the boss of the foundation slab crew said it was completely fine (but of course he would say that).

I would really appreciate serious opinions on the following pictures:

 

haydee

2018-05-15 13:12:56
  • #6
I don't like it instinctively either. Do you have an expert? I would get one, even if it's just for the foundation slab.
 

Similar topics
21.10.2011Floor slab insulation "Yes!" or "No!"14
18.09.2012Construction of a base slab with frost skirt but without foundation10
31.05.2015Wastewater pipe concreted in the floor slab at the wrong location29
14.09.2012House financing - house, garage, and foundation slab approx. 290,000 EUR11
26.10.2012External perimeter insulation floor slab, basement mold risk11
01.04.2020Construction Manager Area Neukirchen-Vluyn (Duisburg/Kleve/Wesel)10
21.11.2013Is the floor slab still possible this year?15
10.02.2014Commitments from the construction manager - Trust relationship13
09.03.2014Construction manager missing10
18.08.2017Base plate ready - construction supervisor absent20
13.11.2017Construction scheduling - Who has to create it? General contractor, site manager?11
15.01.2018Can a construction manager resign due to poor performance?16
22.04.2018Construction is continuously delayed - call the site manager?36
22.09.2018The floor slab for the sewage pipes was poured incorrectly!10
11.03.2019Is the base plate too deep (planned)?30
31.05.2019The construction manager does not come, does not check, or he doesn't care about anything16
12.08.2019First appointment construction manager - Tips?11
17.10.2020The base plate was cast too large - it has now been shortened - is that okay?48
28.12.2020All wastewater pipes in the floor slab are incorrect.14
07.05.2023Is it sensible for the expert to inspect the base plate?55