KingSong
2018-05-13 07:49:50
- #1
If concreting is supposed to take place on Monday, the site manager will already know how far along things are.
I don't think so, the site manager is 300km away and I don't think he cares about severe weather warnings, whatever.
I would rather be afraid that the ramp on which the house is supposed to stand will wash away
Why does everyone always think the embankment is so vulnerable? When the earthworks engineer, structural engineer and site manager see no problem in it? The embankment is only 1.30m above ground level in the lower last 1/6, after 3m towards the north we are only 0.80cm above ground level and from the middle on we are already cutting into the terrain....
The steel is already in and twisted together
The steel is not twisted together yet, and it's only one layer.