We will build in Wiehl.
I already understand that it will take at least a year. It’s not as if we want to do everything ourselves. Maybe only the things where the labor costs are higher than the material costs. We would have the roof, doors, and windows done.
We always do everything outside ourselves. Digging the pond (with a bridge and a "small" waterfall), the space in front of the house, and all the paths were paved by my father and me. As I said, that won’t be the problem, but the time will. Maybe it will be an HSW house, in which case I would keep my hands off and maybe only do the insulation. From there on, only the interior finishing.
I already understand that it will take at least a year. It’s not as if we want to do everything ourselves. Maybe only the things where the labor costs are higher than the material costs. We would have the roof, doors, and windows done.
We always do everything outside ourselves. Digging the pond (with a bridge and a "small" waterfall), the space in front of the house, and all the paths were paved by my father and me. As I said, that won’t be the problem, but the time will. Maybe it will be an HSW house, in which case I would keep my hands off and maybe only do the insulation. From there on, only the interior finishing.