Jann St
2021-05-14 23:10:19
- #1
So I would check the elevation at your neighbor's place. The concrete should already have been "underground" there and in the previous situation. Therefore, I think the area is sufficient for the material that was piled up. The stuff could be applied with a brush, that's a job anyone can do and relatively inexpensive. I don't think more can be expected for such a wall. I mean, on your side the adhesive is still oozing out, so that is certainly sufficient. If you want to spend a few euros more, you can use a slurry that is plastic-modified. I can dig up a datasheet at work on Monday. I think it was around 40€ per bag.