Krolock
2011-02-07 10:13:45
- #1
Hello here in the forum,
according to the payment plan, an installment payment is due after the rough installation of sanitary and electrical work has been completed. The situation is now as follows:
Sanitary:
- no outdoor tap installed (neither the pipe nor breakthrough)
- no washing machine connection
- complete absence of fresh water supply/sewage line in the kitchen (wall breakthrough to the sewage line/downpipe missing – this will probably be removed again because no connection possibility was planned)
- the wall breakthrough to the outside for the sewage line has not been made
- In the bathroom, toilet, only about 1 m of fresh water pipe is hanging (from the distributor, water tank, shower), further fresh water pipes are not present and therefore not connected
Electrical:
- no electrical box/fuse box, cables hanging from the basement ceiling
- no socket outlets prepared in the drywall walls
- likewise no ceiling openings for the spotlights
- basement with rough plaster, no surface-mounted electrical installation at all
Which criteria speak for the completed rough installation?
Given the construction status, should the invoice be paid now?
according to the payment plan, an installment payment is due after the rough installation of sanitary and electrical work has been completed. The situation is now as follows:
Sanitary:
- no outdoor tap installed (neither the pipe nor breakthrough)
- no washing machine connection
- complete absence of fresh water supply/sewage line in the kitchen (wall breakthrough to the sewage line/downpipe missing – this will probably be removed again because no connection possibility was planned)
- the wall breakthrough to the outside for the sewage line has not been made
- In the bathroom, toilet, only about 1 m of fresh water pipe is hanging (from the distributor, water tank, shower), further fresh water pipes are not present and therefore not connected
Electrical:
- no electrical box/fuse box, cables hanging from the basement ceiling
- no socket outlets prepared in the drywall walls
- likewise no ceiling openings for the spotlights
- basement with rough plaster, no surface-mounted electrical installation at all
Which criteria speak for the completed rough installation?
Given the construction status, should the invoice be paid now?