Rescheduling costs - costs for a fall?

  • Erstellt am 2015-03-31 21:29:51

Bauexperte

2015-04-01 17:11:33
  • #1
Hello,


No, it is a upper storey and above that lies the attic.


And reinforcement was inserted into this 24 cm wall or in the floor slab directly under the wall? I confess, I have no idea what exactly you mean ....

Rhenish regards
 

eisbaer_oz

2015-04-01 21:17:46
  • #2
@ Bauexperte
Thank you for your detailed response
 

Jochen104

2015-04-02 09:00:56
  • #3


Ok, maybe I am also explaining poorly.
The reinforcement is integrated into the ceiling and into the concrete of the ground floor slab. Since the thickness of the slab at this point is not sufficient, the reinforcement protrudes upward and there it is also concreted as a kind of base for the wall.

A picture often says more than a thousand words:

Here you can see that the reinforcement in this area is higher than the later concrete slab (see pink insulation). Of course, the rest of the steel bars are still missing in the picture. Top left is just a leftover piece that was still lying there.
I hope you now understand what I mean
 

Bauexperte

2015-04-02 12:09:36
  • #4
Hello Jochen,

Thanks for the explanation; now the fog has lifted

This is a strange way to create a "beam" or "stabilization"; if the structural engineer has approved it - ok.

I'm not sure that I, as a client, would have agreed to such an execution at all, because the electrician will have to set the boxes - which are usually installed near the foot space - higher. Not to mention that this part of the reinforcement must first be shuttered, filled with concrete, and only then can it be conventionally built up again. That will call the plasterer back into action...

Rhenish greetings
 

Jochen104

2015-04-02 13:39:34
  • #5
Hello Martina, yes, that's just how it is with the pictures The structural engineer has it that way in the documents. Otherwise, I would have opposed it. It will not be as high as you feared. The top edge of the concrete will still be below the screed. Therefore, there should be no problems with sockets or the plaster. And there are also no material changes in the wall above the screed that will still be visible.
 

Similar topics
05.06.2010Basement made of high perforated bricks or concrete?11
09.10.2016Roofing - Clay or Concrete?16
07.09.2017Floor slab: Concrete or wooden beam ceiling - Advantages and disadvantages!?20
09.02.2016Should concrete be waterproofed or allow water to pass through?14
20.02.2016Basement made of watertight concrete - switch problem12
22.12.2016Is rain harmful to concrete slabs?12
28.11.2019Concrete vs. Clay Roof Tiles26
08.07.2016Concrete under downspout of roof gutters13
11.10.2016Reinforcement / Armature visible31
13.10.2016Removing tiles from concrete16
26.04.2021House made of concrete without additional insulation - monolithic12
01.02.2017Basement originally partially concrete, now possibly completely brick-built28
14.04.2017House construction from concrete vs Energy Saving Ordinance 201631
10.07.2017WU concrete + flush-mounted boxes in the residential basement - how can this be solved?33
27.08.2017Rust spots on concrete - ceiling to wall - new construction12
20.11.2017Can drywall be glued directly onto concrete?29
27.06.2018Thickening an L-stone using formwork and concrete?15
27.05.2020Set formwork blocks on the foundation or in concrete21
24.03.2021Cracks detected in basement concrete exterior wall, how to proceed?33
04.09.2021Structural engineer not for probation acceptance, and now?21

Oben