Olli_35
2020-06-09 08:55:29
- #1
If I have understood everything correctly, I have to knock off the gypsum plaster anyway. I then have to even out the unevenness underneath with plaster since the panels are supposed to be glued over the entire surface. So the plaster also has to dry there. We have already prepared ourselves not to sleep there for several weeks anyway. So being out of commission is not that bad. There is only a bed (at least 10 cm from the wall) and a dresser in the bedroom, as we have a walk-in closet right next to it. The mold infestation is also always minimal, as I have always reacted early and tackled it with mold remover. AGO mold remover set 4 pcs --> is actually really good. I wouldn’t have thought so myself, I had already tried others before, but none was even close to as good as this set. I will try the lime plaster and if it does not bring the necessary calm, I’ll have to bite the bullet and reconsider the panels. At the same time, I also want to close the radiator niche and replace the old cast iron heating with a new Hz. The basement ceiling underneath will also be insulated, but I can only do that after the new heating pipes are laid. I think and hope that all these measures will solve the problem. It would be great if you could tell me yours. Can it also be set by times? Then you could turn it off during the falling asleep phase.