Payment plan set up strangely?

  • Erstellt am 2019-02-02 19:12:55

hampshire

2019-02-10 10:43:28
  • #1
Attitudes can be so different.

We are currently building with established local craft companies that know each other very well and have already completed some outstanding projects together. They receive monthly progress payments based on performance. With the carpenter, the services are not immediately visible; the walls are built in the workshop and then delivered and erected on the construction site. So we also pay for walls that we cannot yet see on the property. In return, none of the craftsmen demanded any security as to whether we can pay the contract.

This is neither risk- nor cost-optimized. Everyone is "keen" on the project. Many details are exceptional potential future references for the craft companies. On the construction site, every employee is in a great mood. The identification with what is being created is strong. That counts for us because this means the likelihood is very high that our house will be exceptionally good. That is our goal.

In the end, it is your decision and your risk.
 

lin0r87

2019-07-24 07:42:05
  • #2
Hoihoi,
Are the surveying costs also hidden somewhere, or are they paid separately? Can you read anything from it?
 

ypg

2019-07-24 08:38:37
  • #3
Surveying costs are to be borne by the builder
 

lin0r87

2019-07-24 08:47:55
  • #4


Hi there, thanks for the quick reply. So it is usually normal to still receive an invoice.
 

mambo1988

2019-09-23 20:18:45
  • #5
Hi linor87,

I believe we are about to build a house with the same developer. The payment schedule looks very familiar to us.
Have you already started building? Has everything worked out well so far? I would like to exchange some thoughts.

Thanks for the feedback.
 

lin0r87

2019-09-23 20:26:48
  • #6


Hey hey,
That would be something.
Where are you from?

We are in the planning stage. Should start soon.
 

Similar topics
02.02.2009Building materials are stolen at the construction site12
20.02.2014damp walls at terrace doors and front door11
19.11.2013Walls made of Styrodur or Styrofoam?10
27.03.2014What must be considered when removing or relocating walls?10
12.06.2014Walls of a new single-family house, ground floor runs crooked, defect correction construction defect19
28.06.2015Tile walls before floors?11
04.01.2017Plaster walls in new construction or use fleece?16
02.08.2017Costs for interior finishing: flooring, walls, ceilings24
06.04.2018Floor plan change - Load-bearing walls in the apartment. What to do?14
18.07.2018Garage construction made of concrete! 3 walls or house extension? What do you think?26
11.10.2018Waste on the construction site - What is tolerable?138
29.07.2019Replaster/re-clad walls (with photos)12
27.11.2020Myth?! "Breathing Walls" What is the truth?54
23.03.2020Curfew: Am I still allowed to go to the construction site in Bavaria?73
21.08.2021Walls painter fleece / ceiling lime paint?22
19.04.2017Electroosmosis to renovate damp walls11
10.09.2021Plaster Q2 walls with roll plaster or other recommendation?27
17.05.2022Decorative tiles - 3D tiles - show off your special walls34
06.04.2023Tile patterns on bathroom walls26
12.01.2025Comprehension question: Gable roof - load-bearing walls - floor plan11

Oben