Payment plan set up strangely?

  • Erstellt am 2019-02-02 19:12:55

lin0r87

2019-02-02 20:07:24
  • #1


We have no idea about that
That's why I'm asking.
 

hampshire

2019-02-02 20:32:22
  • #2


Hard to say. Rather yes.
In 2001, we bought from a developer. The preliminary services were lower then. Now we are building on our own with an architect and local craftsmen. The preliminary services are significantly higher there.
 

M4rvin

2019-02-09 00:02:59
  • #3
So I think 20% before the base slab is laid is already quite a lot. Definitely withhold 5% from the first installment!
 

Obstlerbaum

2019-02-10 09:07:58
  • #4
In my eyes an absolutely unacceptable payment plan. 20% of your hard-earned money changes hands as soon as he has put his sign on the construction site...

For comparison: we pay the first installment when the roof is covered.
 

Yosan

2019-02-10 09:21:26
  • #5
I find it strange too. After submitting the building application (everything up to that point was already handled by the general contractor), we would theoretically have had to pay the first 10% (or even less... I'm not quite sure right now). But so far, that hasn't even been requested. So until now, we haven't paid the general contractor a single cent, and according to his structural engineer, it starts in March.
 

Kekse

2019-02-10 10:17:35
  • #6
I think it’s okay to pay for the planning services upfront, but not at that amount. We have 5% after the building application and the next 20% nachdem the foundation slab is poured – and we will probably renegotiate that now because it is too much for us.
 

Similar topics
18.09.2012Construction of a base slab with frost skirt but without foundation10
31.05.2015Wastewater pipe concreted in the floor slab at the wrong location29
14.09.2012House financing - house, garage, and foundation slab approx. 290,000 EUR11
21.11.2013Is the floor slab still possible this year?15
23.11.2014Stone throw on foundation slab - builder's liability insurance?16
07.09.2015Minimum distance from the base plate?11
11.09.2016Base plate - construction/insulation etc. - experiences please!10
05.08.2016Leave the floor slab over winter15
20.08.2016Base slab vs strip foundation15
13.09.2016Insulation under the floor slab EPS or XPS?12
29.07.2018Perimeter insulation under the floor slab and still XPS under the screed?28
06.10.2016Base plate with defects?22
27.11.2016Double insulation below and above the floor slab?10
17.05.2017Combustion air supply / chimney stove - thermal air draft or base plate17
28.06.2017Basement costs - Is the floor slab offset?17
18.08.2017Base plate ready - construction supervisor absent20
18.08.2017First invoice for earthworks and base slab due25
21.10.2017Sealing the base slab before the roof is installed19
06.10.2019Base plate with concrete core activation. What is your opinion?46
14.03.2018Slight slope, building with a basement or a floor slab?16

Oben