As mentioned, that was the first offer for the fixed price of the GU. The detailed electrical planning took place last week. We went through our plans with the electrician and specifically determined the number of sockets, etc.
Currently, we have 75 lighting circuits (whatever that means), 45 switches, 97 sockets, 10 LAN duplex sockets, 11 room thermostats, 24 x motor connections, etc. That amounts to €43,000 net. The kitchen power circuits are not yet included here and still need to be coordinated with the kitchen manufacturer. Overall, the gross amount is certainly close to €55,000.