New windows - Wunsch Internorm KF320

  • Erstellt am 2024-01-29 09:05:12

simond76

2024-02-08 16:26:09
  • #1
Hello everyone,

the second offer has now arrived and I am not sure about the installation, is this still timely:

Window renovation includes: dismantling and
reinstallation of the windows, foam filling of cavities,
sealing on both sides with sealant including structural content according to
the state of the art; painting work by the client

Thank you all
 

Allthewayup

2024-02-08 20:36:01
  • #2
This is still occasionally foamed today, especially during renovations, as previously no smooth coatings were required in order to use a compression tape. Today, this is more common in new construction.

Presumably, hardly anything else besides foaming is economically feasible. Reworking the reveals so that the compression tape fits adequately, including the drying time of the smooth coating – no one does that in an inhabited house. You can hardly live without windows in it for two days.
And when it starts raining, the chaos is complete. The sealant probably refers to the connection to the plaster, which is usually a black fabric strip that is then plastered over. This is also state of the art.

You can explicitly ask about the individual work steps again and say you definitely want to understand that.
But for now, I do not see any “botched work” in the offer text.
 

jens.knoedel

2024-02-09 09:10:34
  • #3
No, but you can (and do) chip off a few centimeters of plaster on the inside, install the window (foam it), and glue an internal window sealing tape. On the outside, use multifunctional tape. And then the rule "tighter inside than outside" applies. Restoring the interior nicely then falls under "painting work by the builder."
 

Allthewayup

2024-02-09 19:10:35
  • #4
The fact that the plaster has to be partially removed and redone I considered self-explanatory, which is why I did not go into more detail. I believe we already agree on that.
 

Similar topics
03.06.2014Interior design - windows14
18.06.2014Inspector defect identification, determination of window installation10
18.05.2016Help needed with window arrangement!32
09.04.2015For porthole, special regulations? Window, single-family house 1.5 stories.18
22.04.2015Window, roller shutter, exterior plaster10
28.05.2015Round window - dissatisfied with the interior reveal16
27.05.2015Which roller shutters with a closed window, only glazing?13
15.10.2015Kitchen planning with deep windows43
12.11.2017Minimum width for a 2-wing window/terrace door?48
10.12.2015Proper drying / tilting the window?24
21.02.2016Secure windows/front door for edge location34
29.05.2016Single-family house, single storey, knee wall, upper floor window30
09.09.2016Controlled residential ventilation and still open windows at night71
08.09.2016Window connection / reveal in double-leaf masonry24
05.01.2020Window - Installation / Insulation / Sealing / Execution16
06.07.2020Facade design for single-family houses, feedback and ideas, broom finish plaster41
22.09.2020What products are used for post-construction cleaning / cleaning windows and tiles?19
16.12.2020Gray/Anthracite-colored windows - the new "white"?90
01.02.2023Sealing tape for the window frame22
29.05.2023Exit terrace doors and external window sills, floor-to-ceiling windows15

Oben