What does the calculation include? Where do ancillary construction costs, exterior facilities, painting, and floor coverings appear? Viebrockhaus is just as standardized as any general contractor and turnkey basically does not include this and that. Has the V. house already been fully planned with all extras? But since Viebrockhaus is one of the more expensive providers, one must assume 2000€/sqm in Lower Saxony as well. Therefore, it should not remain at 385k, and even 420k may not be enough or only barely sufficient. I see equity here only for the kitchen, furniture, and lamps; everything else should be financed.Conversations with an architect (and for comparison Viebrockhaus) have been held. The single-family house is planned at 385k including VAT and ancillary costs.