EigenheimBW17
2022-07-21 12:24:10
- #1
Dear forum,
We are currently planning to demolish an old house down to the top of the basement ceiling and then build a new ground floor and upper floor (1.5 stories, gable roof) on top. The basement is then only to be used as a storage cellar and will not be insulated; the previous living spaces in the basement will be moved to the upper floor (previously a bungalow).
The old house is still inhabited at the moment; in the basement there is the old oil heating system and oil tanks, which are to be removed in the course of the demolition and replaced by an air-to-water heat pump. The location of the heat pump is the basement, but as of now it only heats the ground floor and upper floor, possibly also the insulated stairwell to the basement.
My question: In my opinion, there is no KFW funding for heat pumps in new buildings. But isn’t this a modernization (despite partial demolition), so that funding would be possible?
Would the application still have to be made while the existing ground floor is still standing, or is it irrelevant if the application is only submitted when the existing building (except the basement) is already gone?
Thanks for your assessment!
We are currently planning to demolish an old house down to the top of the basement ceiling and then build a new ground floor and upper floor (1.5 stories, gable roof) on top. The basement is then only to be used as a storage cellar and will not be insulated; the previous living spaces in the basement will be moved to the upper floor (previously a bungalow).
The old house is still inhabited at the moment; in the basement there is the old oil heating system and oil tanks, which are to be removed in the course of the demolition and replaced by an air-to-water heat pump. The location of the heat pump is the basement, but as of now it only heats the ground floor and upper floor, possibly also the insulated stairwell to the basement.
My question: In my opinion, there is no KFW funding for heat pumps in new buildings. But isn’t this a modernization (despite partial demolition), so that funding would be possible?
Would the application still have to be made while the existing ground floor is still standing, or is it irrelevant if the application is only submitted when the existing building (except the basement) is already gone?
Thanks for your assessment!