Hello everyone,
thanks for the many responses in such a short time :)
I will try to address all questions so that in the end it’s clear how realistic my plan is.
How do you want to do all that yourself? Do you have a skilled worker for every trade?
No, I don’t have any helpers from construction. I myself am an electrical engineer in industry, so I’m not from construction either. I’m just a DIY enthusiast and do a lot of DIY. The electrical work shouldn’t be a problem; I also connected our photovoltaic system, wallbox, etc. myself. Control cabinets for single-family homes are available preconfigured and ready, and I can handle laying all the circuits...
I also want to install the other trades myself as far as possible. I do think I am capable of installing a heat pump and underfloor heating; it’s not that complicated. I have never done it before, but there are plenty of instructions for it, so in my assessment it is doable :)
Interior finishing – what does that include?
Plastering or cladding interior walls
Applying screed
Drywall construction
Floor coverings
Painting & wallpapering work
Installing interior doors
Installing sanitary ceramics & fittings
Exterior plastering should be done on the prefabricated house shell
I know people who plaster their houses themselves and also apply screed, but those aren’t building their first house...
Yes, they have done it once themselves at some point too :)
Foundation, earthworks??
Why 0 euros for roof and windows?
Why 0 euros for structural engineering?
Who is the authorized draftsman for approval and what are the costs?
What timeframe is planned for the construction project?
When will you work to earn the money?
Foundation is missing, thanks. Earthworks are not much because the plot is flat. Structural engineering, roof, and windows are included with the prefabricated house provider in the shell construction package.
Plan: Shell construction by the prefabricated house provider in a few days. Everything else within one year, using the complete annual leave (50 days in my case) for the construction, the rest after work). By the way, the house is timber frame construction.