Is it possible to measure the kitchen in the shell construction after the interior plaster is completed?

  • Erstellt am 2018-07-26 17:31:17

tomtom79

2018-07-27 08:37:26
  • #1
Our measurement service refused to carry out the 3d survey without tiles and mounted switches. As a result, we had to live for 6-7 weeks with a Bauhaus kitchen sink for 99 euros, we cooked on a hotplate and an old refrigerator from Kleinanzeigen, but that will pass too.
 

ares83

2018-07-27 08:41:42
  • #2
That is possible even without screed. However, it gets tight when, as in our case, a countertop running into the window with a 78 cm carcass underneath is planned. It depends on the height of the window. If the screed does not fit then, it may be that you can no longer go any lower and it no longer fits.
 

kaho674

2018-07-27 12:06:27
  • #3
I see no problem with the measurements once the plaster is on. You probably don't want to panel the walls with wood or something similar. The height is taken from the plans and is adjustable anyway. One might need to be careful with possibly oversized door frames or wall-running sliding doors when hanging wall cabinets. The direction of the door swings should also be indicated in the plan. I can't think of anything else that could be in the way. Are the sockets and switches already visible?
 

BenutzerPC

2018-07-27 14:35:06
  • #4
They are currently hidden under the plaster. Above all, compared to the initial kitchen plan with the electrician, we have planned 2 additional sockets. That should not be a problem. You can easily cut that out of the countertop. We raised the countertop about 30cm at the back and planned sockets there.
 

kaho674

2018-07-27 14:49:31
  • #5
For the measurement, I would expose all the boxes, mark them, or make them identifiable in some other way. If they are missing, it will be a mess.
 

Similar topics
15.10.2013electric roller shutters / switch17
27.02.2015Burglary-proof windows?33
21.05.2015Can roller shutters with switches be retrofitted for wireless control?14
24.12.2015Electrical planning - sockets88
13.04.2016Electrical planning: Where to install sockets, LED and LAN outlets?19
28.04.2016Order screed - plaster14
31.07.2016Electrical inspection, Q2, bathroom tiles, knee wall, floor-to-ceiling windows23
05.01.2017Bathtub in front of the window - parapet height?14
05.04.2017Super disaster - water pipe burst, screed damp31
21.11.2018Switch for roller shutters on the window or on the door?38
19.08.2017Technical room before installing screed: should the technology be painted now or later?16
24.01.2018Is the floor still too wet or is it already normal?27
20.07.2018Problem calculating the parapet height for a worktop running into the window24
02.08.2018SchwörerHaus: Seam in the plaster between two floors? Is that so?27
21.12.2018Roller shutters with a switch and central timer, is that possible?23
04.08.2019Sockets: Always prepare sets of 5? What is the best way?25
16.01.2020Screed no functional heating after 7 weeks20
19.03.2020Lime-gypsum plaster crumbly and therefore defective?21
12.02.2021Retrofitting FI switches, older electronics18
14.02.2022How many power outlets should a kitchen have at minimum?19

Oben