Is it possible to determine the eligible costs based on a rough estimate?

  • Erstellt am 2017-03-28 14:06:38

Slava_S

2018-01-30 08:36:46
  • #1

How did the search go, or which option did you choose?
 

mertmk3

2018-01-30 08:55:19
  • #2
We are building with an architect, who also includes structural engineering, etc. There was a flat-rate offer with a specific percentage of the eligible costs, regardless of the HOAI.
 
Oben