Installation of heat pump/heating - before or after screed

  • Erstellt am 2021-06-07 08:37:26

Deliverer

2021-06-07 09:12:57
  • #1
Is it even about an internal constellation? In that case, I have no idea. ;-)
 

Mycraft

2021-06-07 11:51:22
  • #2

No, I follow the manufacturer's instructions and you are also allowed to use your brain, that doesn't hurt either.

But anyway. Definitely before the screed is brought into the house.
 

nordanney

2021-06-07 12:04:13
  • #3

So, on a composite screed pedestal or similar.

Then just give the OP information on how to do it and don't make yourself pull information out of your nose first ;)
 

Mycraft

2021-06-07 12:46:02
  • #4

For all I care, also with the help of Siemens air hooks. The question from the OP is not how exactly and with what means but simply: When?


I have already done that twice now in this thread. Before the screed.
 

i_b_n_a_n

2021-06-07 15:44:57
  • #5
Our screed installer informed us: Earliest! after 3 weeks screed can be heated/dried via heat pump. Since we do not yet have a heat pump and it will probably take at least another 4-5 weeks to arrive, I asked in detail. This is also no problem, just not before three weeks after installation. We should keep the windows tilted open for the first three days (no draft), then ventilate once or twice a day for 15-20 minutes each. By the way, it is cement screed without additives. I suspect it all depends on the type of screed and the additives used when and how heating should/may be done?
 

Deliverer

2021-06-07 15:56:39
  • #6
Yep. For me: After 24 hours 20° for 48 hours. Then 25° for 48 hours. Then 40° for four or five days. Or until the measurement says "dry enough." So after about 10 days it was dry, thanks to the accelerator.
 

Similar topics
09.06.2015Gas, heat pump, and solar for a single-family house?36
19.05.2021Experiences with brine heat pump491
29.07.2018Perimeter insulation under the floor slab and still XPS under the screed?28
08.06.2020Air-to-air heat pump vs air-to-water heat pump vs ring trench collector - differences50
21.03.2020Heat pump on a pedestal or directly on the floor?12
14.04.2020Air/Water Heat Pump Active Cooling15
14.10.2022Air-to-water heat pump sizing in new construction311
14.12.2020Ice formation brine pipe heat pump78
04.01.2022Air-water heat pump current consumption and data1439
25.11.2021Roth heat pump single-family house setting / optimization23
31.03.2022Air-Water Heat Pump - Buffer Storage Yes or No?28
14.05.2022Old building apartment with gas boiler - underfloor heating now, heat pump later14
21.06.2022Renovation of heating system for existing property - condensing boiler/air-water heat pump/DHW heat pump25
10.08.2022Hydrogeological Report - Geothermal Energy, Air-Water Heat Pump or Ice Storage?26
17.10.2022Heating screed with device vs. with heat pump: costs?19
25.11.2022Mill underfloor heating or apply new screed?17
02.03.2023Heat pump for KfW55 house 148 sqm99
24.11.2023Heat pump: buffer tank, capacity and modulation46
13.02.2024Heat pump is not compatible with a water-bearing fireplace144
22.01.2024Operating costs of air-to-water heat pump, consumption and defrosting16

Oben