You think so? For it being "only" earthworks, I find it rather in the upper third. In the end, it was just excavating, putting in frost protection gravel and compacting, and later digging and connecting the drainage. Unfortunately, due to the poor soil, it was the only acceptable option. We could have done a strip foundation, but then we would have had to completely replace the soil inside as well. The floor slab came from the [GU].