markusla
2024-11-30 21:59:49
- #1
Next week is the move. Most of the new cabinets are already assembled. Unfortunately, on Thursday the electrician hit the floor heating supply line while drilling in the stairwell, and the beautiful oak floorboards on the stairs got a lot of water. Let's see how that develops. However, the pipe was repaired after 2 hours, so the heating at least keeps running.