Hello everyone,

we are currently considering the possible construction of a detached house in Lower Saxony. A developed plot of land already exists. The following parameters are planned: Approximately 195 sqm of living space, ETICS, two-story construction, shed roof, air heat pump, medium - upscale equipment.

We are very skilled in crafts and have many contacts in different trades who would support us. We would be interested to know how much savings potential you would consider possible through the described own contributions.

Please leave discussions regarding time duration, risk, and availability of labor aside. We would really like to know how much savings potential could be achieved here and what total price we have to expect.

The following trades could be done by ourselves:
    [*]Earthworks (overall but little required) [*]Base slab (some masons in the family) [*]Shell construction/masonry (several masons in the family) [*]Roof structure & covering (also family) [*]Electrical (I am an electrician myself) [*]Floors [*]Sanitary installations [*]Plastering work [*]Painting work [*]Interior doors [*]Outdoor facilities (father is a landscape gardener)


---> What is the maximum savings potential here? -- > What total costs must we expect?

Best regards, Michael
 

kati1337

2023-03-20 09:30:22
  • #2
What the cost is depends largely on the materials used in your setup? Basically, you would do everything yourself except for architecture/structural engineering/applications, and the sanitary services?
 

MBader40

2023-03-20 09:31:51
  • #3
Yes, essentially. We would do the plumbing ourselves. We would contract out the heating.

Regarding materials: We are currently planning with a monolithic construction method.
 

HnghusBY

2023-03-20 09:48:59
  • #4



I think that's where it starts. [WDVS] or monolithic? Which bricks, how efficient should the building be, etc.?
No one will be able to tell you any potential savings like this – compared to what do you actually want to save? In the end, you just need to calculate the material costs and that should roughly work at a building materials dealer. You have a quote made for the heating.

--> maximum saving potential: you get the building materials for free
--> total costs: about what you pay for the building materials, if you don't get them for free
 

Nida35a

2023-03-20 09:50:48
  • #5
There are huge differences between cheap and expensive. Like with a car, 4.70m long, between Dacia and Audi. Calculate 195x3500 €/m2 = approx. 700K€, you will also need plenty of material with EL. Do it, and afterwards report how much money was saved.
 

KarstenausNRW

2023-03-20 10:32:17
  • #6
Let's do a rough calculation.

The construction costs for your hut are currently around €680k for medium to high-end equipment. Additionally, incidental construction costs, outdoor facilities, etc. Then let's assume a labor cost and profit margin of 20-25%. Savings potential thus +/- €150-200k overall.
 

Similar topics
31.01.2012Plan stones behind ETICS, plan stone variant or joint masonry, costs13
14.01.2013Cracks in plaster facade WDVS (expansion joints?)11
23.08.201317.5 Poroton + 16 WDVS or 36.5 Aerated concrete19
25.11.2013Exterior wall with ETICS or exterior wall with lightweight plaster?23
16.09.2014Ventilation in prefab houses (wood frame with ETICS) also in solid houses?36
10.03.2015Skepticism regarding ETICS on new multi-family residential buildings40
19.06.2016Insulation reveal window WDVS and clinker plus transition12
18.08.2016New construction with sand-lime brick + ETICS - Criticism?!32
06.04.2017Construction method: 36.5 cm aerated concrete or 17.5 cm + 14 cm external thermal insulation composite system (ETICS)37
28.03.2021Window installation WDVS - When can the window fitter take measurements?24
08.05.2019Aerated concrete or sand-lime brick with external thermal insulation composite system (ETICS) made of polystyrene29
27.07.2019Cost comparison: reinforced concrete + ETICS vs. brick or wall + ETICS22
21.01.2021Exterior plaster is uneven, window sills are too short, tightness of the ETICS (External Thermal Insulation Composite System)63
06.01.2021Savings potential in lighting sampling12
20.02.2021Exterior wall for KFW 40 (+) with or without ETICS?86
18.04.2021Subsequent installation of a roller shutter in ETICS26
19.05.2021Are cracks to be expected in monolithic wall construction without ETICS?17
26.01.2022Fall protection for floor-to-ceiling windows WDVS11
17.07.2023Plaster facade WDVS mineral wool brown stains12
17.05.2023Same price: Kfw55 with Poroton monol. OR Kfw40 with Poroton WDVS?31

Oben