Electrical installation in a prefab house seems very expensive to us?!

  • Erstellt am 2018-03-01 20:07:44

Wickie

2018-03-27 14:06:50
  • #1
Looks similar with us as with you - about €20K for 165m². Regarding the points you mentioned here, also the electrical box with 4 meter slots, separate sub-distribution for the upper floor, installation including Warema control. When I think about how long the guys were wiring there... The price is fair!
 

Alex85

2018-03-27 18:15:19
  • #2
What do you plan to do with four points?
 

Wickie

2018-03-27 18:47:37
  • #3
We are preparing for all eventualities... regular electricity meter (of course), heat pump (IN CASE it ever becomes worthwhile... probably not), photovoltaics (so far only in preparation, but will probably still be installed), electric vehicle. I also thought it was crazy, but according to several opinions (also here in the forum) not that far-fetched. But if you had all of that, of course you would have 4 x basic fees. We'll see where this goes, the box wasn't much more expensive anyway. Retrofitting is definitely more annoying.
 

mertmk3

2018-03-28 08:27:21
  • #4
I have also planned a separate sub-distribution board for each floor, plus one in the garage, which separates my garden/outdoor lighting as well as photovoltaic/electric car from the rest.

I think it is worth planning more comprehensively here.
 

DanielaS

2018-05-04 10:29:23
  • #5
So we are looking at a new build, 177 sqm with everything included, including preparation for photovoltaics, a generous number of sockets, satellite dish, power cables, distribution box, LED lights in the kitchen and bathroom ceiling and on the stairs, plus electric shutters with central control and many more, at €16,000 gross. I would definitely get another offer. For the equipment, I find €18,500 way too expensive.
 

cybergnom

2018-05-04 15:25:51
  • #6
I would always insist on receiving a complete offer that clearly shows how the final price is composed. The same applies to the billing: How many meters of cable/conduit were installed? How much working time? etc. This way, offers can be reasonably compared.

With this flat-rate rubbish, as a client, you ALWAYS fare worse. You can certainly count on 15%-20% safety margin that the electrician includes and that is ultimately added on.
 

Similar topics
05.03.2010Passive house, heating combination with solar, energy recovery, photovoltaics?38
22.12.2015Is natural stone heating in combination with a photovoltaic system reasonable?16
09.04.2013Is financing a photovoltaic system unprofitable?11
08.12.2014Small photovoltaic system 2 KWp11
12.02.2015Photovoltaic systems & storage systems *collective thread*21
05.06.2015Photovoltaic system for hot water preparation and feed-in15
06.08.2015Photovoltaics for hot water26
20.11.2015Solar / Photovoltaic from an economic perspective53
08.01.2016Photovoltaic system: Self-consumption rate with battery and further questions27
23.02.2016Photovoltaic + Battery - Which System - Experiences?17
08.06.2017Photovoltaic system, how to use experiences like heat pumps?64
26.04.201616.03.16: Start of photovoltaic assembly60
16.07.2016KfW 40+ and 10,000 Houses Program - Requirements for Photovoltaics?13
06.04.2016Financing for 15 or 20 years? Photovoltaics via KFW?10
30.05.2016KfW55: Gas or air-water heat pump with/without photovoltaics17
30.05.2016Photovoltaics on the roof as a second layer11
21.06.2016Heat pump with photovoltaics vs gas and solar thermal52
10.07.2016Air-water heat pump with photovoltaics or pellet with solar25
13.07.2016Photovoltaic storage - experiences? Tips?17
10.10.2017New photovoltaic system with storage in single-family home - experiences39

Oben