Duration for tile removal in hallway + kitchen

  • Erstellt am 2019-12-26 12:28:12

Eugen2610

2019-12-26 12:28:12
  • #1
Hello everyone,

I would be interested in your opinion on how long it would take to remove old floor tiles in the kitchen and hallway (estimated). The area of the kitchen is 13.85m2 and the hallway 14.21m2. In both rooms, we want to lay laminate or vinyl.

My second question would be how time-consuming and difficult it would be to install underfloor heating based on water or gas in a vintage house built in 1957 in the living room, dining room, hallway, and study.

I am attaching two photos of the hallway and kitchen showing what the tiles look like.

What would be the cheapest disposal option for old tiles, old radiators, and the removal of an old bathroom (3m2)? I am thinking more of a medium-sized car trailer, as I believe it would be cheaper in rental costs than a medium-sized container.

I would be very happy about your answer.

Thank you very much in advance.

 

Osnabruecker

2019-12-26 15:20:29
  • #2
Should the screed be removed as well? Then rather a container because of the quantity. We stripped out a 10 m2 bathroom in one day with 3 men. For you, that would be about 7_8 man-days. But it also always depends on where it is located. Debris chute? Carrying through the stairwell? I won't say anything about the duration of the installation, I would only let a professional handle that.
 

Eugen2610

2019-12-26 18:16:07
  • #3
First of all, thank you for the response.

The screed should stay if possible.
The kitchen is located on the ground floor.

So you mean 7-8 days if Manns does it alone?
 

Osnabruecker

2019-12-26 18:50:23
  • #4
Yes, exactly. You have to lift carefully.

Have you considered the new heights for the [FußbodenHeizung]?
In many rooms you want [FußbodenHeizung], but not in the bathroom and kitchen? That creates height differences. However, I am not a renovation expert.
 

Eugen2610

2019-12-26 19:09:30
  • #5
Yes, we have considered that.

The sellers of the house said I would spend 2-3 days per room removing floor tiles. My brother-in-law, who is a craftsman, says: 0.5 days per room if done quickly or 1 day per room if it is to be done carefully (the tile removal). If necessary, the doors can be shortened.
 

Domski

2019-12-26 19:20:30
  • #6
Alone, 1 room per day I consider doable if you can remove the debris quickly and over a short distance. Are they installed in thin-bed or classic thick-bed method? Thick-bed with a lot of cement can quickly become tedious.
 

Similar topics
29.02.2016Height difference / Level tile - parquet27
24.02.2014KFW55 house with underfloor heating... which type of flooring?11
22.08.2014Underfloor heating or not?20
06.05.2015Living/Dining/Kitchen: How do you live or how will you live?52
18.01.2015New construction Kfw70 underfloor heating and tiles11
24.04.2017Lighting in hallway and kitchen: Are recessed ceiling spotlights needed?19
18.04.2016Heating circuits/thermostats for living/dining/kitchen with underfloor heating/heat pump35
26.04.2016Question about kitchen drainage / piping16
29.04.2016Floor plan single-family house - kitchen problem20
27.05.2016Plastic fittings/water pipes and insulating underfloor heating beneath screed?40
23.05.2016Control of underfloor heating using thermal imaging camera, insulation?26
08.06.2016Questions about underfloor heating - new subfloor/screed/granite tiles14
12.09.2016Water connection outside from the kitchen - possible?39
17.10.2016Door hinge to living/dining area and kitchen lighting13
27.12.2017Underfloor heating heating demand with at least 60 mm screed30
10.11.2019Tiles or vinyl in kitchen and hallway19
09.12.2019Heating in the kitchen "necessary"?35
17.12.2020Hallway and living/dining area same flooring?50
18.01.2021Spontaneous improvements to underfloor heating design33
25.11.2022Mill underfloor heating or apply new screed?17

Oben