Yes, it does. They are different contracts that have nothing to do with each other. There could also be other documents needed for the payout that have nothing to do with the developer.
 

apokolok

2020-02-06 23:32:43
  • #2
Well, it's clearly stated in the original post what's missing. The developer is responsible for most of it.
 

Altai

2020-02-07 05:59:33
  • #3
The OP is complaining that he now has to pay commitment interest, not that an invoice from the developer is due. That doesn’t bother him at all. Apparently, he wanted to spend the entire amount within three months, if you read it that way. It didn’t work out.
 

HilfeHilfe

2020-02-07 07:52:54
  • #4

Yes, and? Were these known to the developer? When undertaking a construction project, you should also take care of things.
 

HilfeHilfe

2020-02-07 07:54:07
  • #5
But because most trades are finished quickly. The developers know this and that banks always need lead time. That's why invoices are issued quickly.
 

uti-pepe

2020-02-07 20:35:40
  • #6
Thank you very much for all the answers. Some even very helpful. I received the first developer invoice at the beginning of December, which was also submitted to the bank at the same time. However, it was not paid out because, see page 1, all the documents are still missing. My developer is being somewhat stubborn here. He says, in turn, that some documents my bank wants are not necessary at all. For example, a dimensioned floor plan (requested by the bank). The list of defects has been known to him since December, but nothing is happening. Hence my question whether I have to accept the whole situation as it is...
 

Similar topics
06.02.2013Developer says: No more insulation!12
23.03.2011Developer or architect?15
26.09.2011Finding tiles from other manufacturers / sample selection for builders13
09.07.2012Developer offer for single-family house - Are the construction costs acceptable?16
16.07.2012The builder "outsources" fixed-price services to subcontractors12
03.08.2012Contract Supplement to the Construction Contract by the Developer36
30.09.2012Developer - Is withdrawal from the purchase contract possible?11
01.12.2014Real estate transfer tax / what is the tax applied to? Which developer MUST?30
18.02.2014Massive problems with the builder - is contract termination possible?33
23.06.2014Developer charges heavily for replanning - justified?12
08.10.2014How do you search for a suitable property developer?30
27.02.2015Construction project with a developer without an official building plan, is a down payment required?12
01.03.2015The developer does not build according to the plan14
15.04.2015Duplex construction: Joint or separate developer?20
13.06.2015New construction with developer / construction drawing documents23
30.12.2017Take over the insurance from the developer after handover of keys?15
26.06.2020The developer has let us down - what to do now?42
16.10.2019Rent for construction dryer in final invoice/builder - legal?14
09.02.2020Developer | Special Request | Cost Assumption38
13.07.2020Developer does not want to offset lump-sum damages with installments19