Hello everyone,

I have read a bit here by now, but I haven’t really made any progress on this topic yet.

We have a plot with an existing building in prospect. There is no development plan for this plot, but in the neighborhood, semi-detached houses have partly been built on similar plots. So that should be possible as far as feasible.

My question now is how to proceed best if I actually only want to build half of a semi-detached house on half of the plot.

- So how do I find a buyer for the other half of the project?
- At what point do I start looking (when the existing building has been demolished, when the planning for the semi-detached house is already done, when the construction company has already been selected?)
- To what extent does that affect the property transfer tax for the buyer of the 2nd half? Did I understand correctly that the buyer also has to pay the tax on the house if I have already fixed everything beforehand?
- What must be considered in a contract for that, or where would you get information about that?

Thanks in advance!
 

nordanney

2024-07-18 17:19:08
  • #2
What is your exact plan? To finish building both semi-detached halves and sell them, or to sell half the plot and have the partner build "their" house together with you at the same time. I would immediately resell half the plot and coordinate with the buyer. That way everyone can build individually but finish at the same time as a "uniform" house.
 

BobTheBuilder

2024-07-19 08:44:50
  • #3
Hello nordanney,

thank you for your reply. I would like to sell half of the property. The only question is how do I coordinate with the buyer so that in the end I can approximately build the house I want.

You should probably determine certain points beforehand (size, with basement or without, type of construction ...) and such things should probably also be included in the contract.
 

nordanney

2024-07-19 08:58:33
  • #4
Exactly. You plan your house (basement yes/no, number of floors, roof type/slope, etc.) or have it planned. And in the purchase contract for the sale of the second half, it is agreed that the buyer must orient their half according to your half based on the attached draft plans (or if the buyer then decides not to build and wants to sell their property further, that they impose this restriction on all subsequent buyers as well). And then you simply build your half. The buyer orients themselves according to your plan and cannot simply build a flat roof if you have a pitched roof. Or three stories while yours is only one story. Size, location of the house entrance, etc. can the buyer decide completely on their own.
 

RomeoZwo

2024-07-19 10:21:45
  • #5
If the desire, however, is for a "mirrored twin," i.e., a semi-detached house with central symmetry, this path becomes more difficult. To really achieve this, one would then have to "play" the role of a developer and sell half a plot with a finished house. However, this carries all the risk during the construction phase. To what extent at least color, shape, and size can be restricted in the sale, please ask the trusted notary. If necessary, one can also sell half the plot "for division," i.e., the plot is not yet divided at the time of the purchase contract, and, for example, a cost-sharing agreement is made.
 

BobTheBuilder

2024-07-19 10:33:54
  • #6
Hm ok, it is a bit complicated as I feared.

In principle, the house does not have to be a mirrored twin. However, it would of course be easier and cheaper if we could build the house at the same time with the same construction company.

As I see it, I have 2 alternatives:

1. I plan my house and build alone and then sell the second half with certain conditions. What I don't like about this is that the advantages of the semi-detached house don't really exist then. For example, if I finish my house and then half a year later the buyer of the other half starts building a basement. Or they don't build for 2 years because they lack the money.
2. I act as the developer, with the corresponding high risk.

Am I overlooking something or does anyone have another idea? Is there perhaps someone here in the forum who has done something similar before?
 

Similar topics
03.08.2012Contract Supplement to the Construction Contract by the Developer36
04.03.2015Budget plot and building with basement21
13.06.2015New construction with developer / construction drawing documents23
10.09.2016Construction financing and contract with the developer24
24.06.2017Semi-detached house, we have no basement, neighbor has a basement23
22.12.2017Construction costs for a single-family house with a basement in NRW84
05.10.2018Buy land first, then build - experiences / tips?26
30.09.2019200m2 single-family house for 4-5 people without a basement on a narrow plot67
30.09.2019Floor plan optimization of a single-family house with a basement on a small plot178
27.06.2020Level the basement or the plot?43
06.01.2020House purchase, prefabricated house from the developer with land10
27.01.2020Building a single-family house with/without a basement on a small plot65
28.07.2020Single-family house 160m2 with basement, 500m2 plot108
09.10.2020Single-family house 220 sqm with basement on 700 sqm plot41
19.10.2020Street about 50cm above the property - backfill or basement24
28.11.2020Expensive plot + single-family house 155 sqm + cellar KFW40+, financeable?60
07.12.2021Floor plan design for a duplex, small plot, Bauhaus style34
04.03.2022Property development - basement yes or no?75
09.09.2024Floor plan design: Single-family house with basement; 560 sqm plot65
18.04.2024Floor plan design: Single-family house; with basement; 800 sqm plot10

Oben