We have set a minimum consumption of 30m³ per person. Only when this is exceeded can one apply for exemption from the excess wastewater portion for the outdoor water tap according to the statutes.
Only in the first year, when it was very dry and we had to water a lot due to the lawn seeding, did we reach 91m³ with 3 people. The outdoor water portion was about 30m².
In all other years, we had between 15 and 20m³ on the outdoor water meter and a total well below 90m³.

However, we have clay soil. With sandy soil, the water demand would likely be significantly higher.
 

86bibo

2018-02-15 11:32:23
  • #2
Getting a second water meter is not a problem at all. However, there is no exemption from the wastewater fee, no matter what you do. Therefore, all discussions are pointless.

This is also pointless in the sense that our surface water is discharged directly into a stream and we are not connected to the sewer at all.
 

Gartenfreund

2018-02-18 13:26:03
  • #3
Changeling is right, the rainwater fee is not exactly small.

Here too, the rainwater fee amounts to about €5000 in 20 years. That is why a cistern was built a few years ago as a DIY project.

As for the excess water, there were three options.

1. Discharge into the sewer. But that would be nonsense since the rainwater fee would still apply.

2. Underground infiltration. For that, the water authority would first have to give their approval. Which again costs money.

3. Above-ground infiltration. This can be done without a permit. It was ultimately done this way because something underground could not be done due to too many trees and shrubs in the garden.

Because of the DIY effort, this system pays for itself quickly.
 

Similar topics
06.02.2015House with 100% own effort41
06.04.2015Our financing with "own contribution"12
14.01.2016Own contribution - what did you do and would you do it again?79
15.05.2015Own contribution: Determination of residual moisture10
09.12.2015Incorrect material delivery for in-house work15
03.12.2015Own effort - What can be sold well at the bank?64
27.01.2016Own contribution - how to present it to the financer?12
22.03.2016Turnkey vs. ready to move in, own contribution17
21.03.2016Own work - floor coverings, painting, tiling, what else?40
01.03.2017Ready to move in - Estimate house costs with own labor18
13.07.2017Which personal contribution is worthwhile in house construction?39
27.06.2018Prefabricated house provider with electrical installation as own work14
23.07.2018Financing project as a single with a lot of own effort22
31.01.2022Possible savings in self-performed structural work37
19.02.2019Which task is worthwhile to do yourself?67
02.07.2019Own contribution in financing a single-family house11
25.02.2020Assessment of construction project with own labor as well as financing27
03.06.2020Construction cost calculation single-family house architect without own work52

Oben