Hello everyone,
Our single-family house was completed in September last year. The architect or construction manager said that the building should be re-measured within 6 months. So the deadline would expire now. However, we want to build a garage, which should be measured at the same time to save unnecessary costs. Is the 6-month deadline really that strict? Who checks this? Are there penalties if this is not done on time?
Best regards
Tobi
Our single-family house was completed in September last year. The architect or construction manager said that the building should be re-measured within 6 months. So the deadline would expire now. However, we want to build a garage, which should be measured at the same time to save unnecessary costs. Is the 6-month deadline really that strict? Who checks this? Are there penalties if this is not done on time?