Good day, I wanted to speak up again. Some time has passed, so I wanted to get in touch once more. Everything is basically settled! The contract was signed in December, in January there were talks with the architect. The base slab will be laid in May. Here is a brief summary for everyone. Kfw70 house: approx. €152,000 (prefabricated house) 1 half of a duplex. My brother-in-law will move into the other side. Land: approx. €36,000 (normally more expensive) Additional construction costs: approx. €30,000 (since 2 houses are being built at once, a saving of approx. €5,000 per house) New acquisitions: approx. €15,000 possibly more Extras for the house €6,000 We would be at approx. €239,000 Total budget we now have is €240,000 Initially, the €200,000 was definitely too little, but we are not over the top now either. We even have a buffer of €10,000. For the additional construction costs we can save a lot, as we can get many things cheaply, among other things. Best regards Sascha
 

Fertig-Haus82

2014-02-05 12:06:40
  • #2


Gas is not needed because we are now using air/heat pump.
Water/sewage: €1500
So we are at just under €3,000 here. All prices inquired.
Possibly rainwater infiltration systems might be added. So max approx. €4,000
 

Fertig-Haus82

2014-02-05 12:55:58
  • #3
No, the foundation slab is extra with €11,000. They are on top of that. But the house is ready to move in except for the upper floor (except bathroom) and downstairs (living/dining room). Upstairs and downstairs areas that won’t be tiled, we will get laminate floorboards in country house style. Will be installed by ourselves. The house normally costs €8,000 more per person. That was the discount because it is then house no. 2 and 3 from the provider.
 

Der Da

2014-02-05 13:00:34
  • #4
That has already been discussed here. It will become interesting in the end, and whether he actually mentions the money paid here.
 

Similar topics
21.10.2011Floor slab insulation "Yes!" or "No!"14
18.09.2012Construction of a base slab with frost skirt but without foundation10
31.05.2015Wastewater pipe concreted in the floor slab at the wrong location29
14.09.2012House financing - house, garage, and foundation slab approx. 290,000 EUR11
18.10.2012Ancillary construction costs and general expenses for a new semi-detached house14
26.10.2012External perimeter insulation floor slab, basement mold risk11
21.11.2013Is the floor slab still possible this year?15
15.07.2014Foundation slab for Danwood bungalow? Company for complete works?11
23.11.2014Stone throw on foundation slab - builder's liability insurance?16
15.06.2015Base slab or strip foundations for garage12
07.09.2015Minimum distance from the base plate?11
11.09.2016Base plate - construction/insulation etc. - experiences please!10
05.08.2016Leave the floor slab over winter15
20.08.2016Base slab vs strip foundation15
13.09.2016Insulation under the floor slab EPS or XPS?12
29.07.2018Perimeter insulation under the floor slab and still XPS under the screed?28
06.10.2016Base plate with defects?22
27.11.2016Double insulation below and above the floor slab?10
22.07.2017Horizontal sealing of the base slab24
20.02.2017Dimensions of the base plate do not match25

Oben