Zaba12
2019-10-21 16:18:33
- #1
So it's usual with us: shell construction with roof but without windows.
It was the same with us. The roof came before Christmas. The windows at the end of January. Before Christmas everything was wet down to the basement. After Christmas dry even without windows!