We have already considered doing it via the house connection. The construction company made us the proposal, basically a good thing, but the appointment is only in 3 weeks. That means construction stop until then and who knows if our shell builder will still be available in 3 weeks and not on another construction site.

I also did not know that it is so complicated. We went there again today
 

danixf

2020-05-10 14:12:39
  • #2
Then someone missed that. Basically, one could have spoken to the municipal utilities right after the building permit and already prepared a construction connection.
 

Matze719

2020-05-10 21:53:30
  • #3
So I already called the responsible employee at the municipal utilities before the application, he was really nice and even tried to explain to me how to fill out the application, which I already knew since I happen to be an electrician and have filled out many before. Everything went well, but your case seems to be a bit more complicated when I read something about [Überfahrmatten] etc...
Best regards
Matze
 

guckuck2

2020-05-11 09:50:27
  • #4
The first thing to do is to hire suppliers. Because they all have lead times. Providing the construction power now is already a failure on the part of the client. Bad luck.

Apart from that, construction sites can also be operated without construction power, e.g. using a generator. What does not work with that is a crane, but for the first steps this is in my opinion dispensable. Earthworks, base slab, first masonry work also work with a generator.
 

Lucky21

2020-05-11 09:56:44
  • #5
The construction power was applied for immediately after the building permit approval, what's late about that? Should one apply for such things without building permits? With construction water, it worked without any problem.

We are not building in a new development area but in a building gap, maybe that's the reason.

Yes, we are working with a power generator in addition to the construction power that is not connected and that we pay for. So we are paying twice.
 

guckuck2

2020-05-11 10:01:55
  • #6


And what went wrong then?



I still don't understand why you can't at least temporarily tap 230V from the neighbor. So once again the message: It doesn't have to be 400V right away, even if the shell builder would of course prefer that. It also works without a crane.

Construction water ... by the way I also considered it important, but for us it was the least important. The shell builder just placed a 1 cbm container and that was it. I only needed construction water for screed/plaster, that can wait.
 

Similar topics
06.12.2017Until when must construction power be taken?22
23.06.2015Secondary construction costs, amount of construction electricity/construction water, how much?18
29.04.2016Organize construction electricity/construction water yourself?31
08.09.2017Which tasks must be completed before signing the shell construction contract?24
19.10.2017Temporary power supply - What costs are involved?19
10.07.2018Does the structural builder have to paint the transition between styrofoam and brick wall black?12
05.07.2018Temporary electricity stolen - amount of compensation?17
20.07.2018Construction power or house connection? How much construction power is needed?12
15.10.2018Is the shell construction overloaded? Current situation in the construction industry!13
08.11.2018Structural shell / Structural shell cost calculation - How does it calculate?52
19.03.2019Construction power is being connected. Does the builder have to be present?10
20.05.2019Temporary power also through alternative suppliers?10
04.11.2019Is only part of the building permit enforceable? How long is the building permit valid?42
04.10.2019Easily switch temporary power provider?21
11.02.2020Withdrawal from the work contract (The shell construction simply does not start)33
23.09.2020Child construction allowance with non-final building permit49
10.01.2022Determine construction power costs / eOn charges too much36
27.04.2022Building permit after preliminary building approval10
23.10.2023Judgment on construction power supply - assessments / experiences?10
09.10.2024Construction electricity/construction water costs are the responsibility of the builder11

Oben