-LotteS-
2023-11-09 06:18:05
- #1
 
Have you already started building? Normally, the calculated values at the time the calculations or the preliminary energy certificate are created apply. I know that the limit values are occasionally tightened. Have you made any changes that would require a new calculation? Or did the house builder exchange any materials if he is already voluntarily covering the additional costs?We have now received information from our energy consultant that our photovoltaic system needs to almost triple and the storage has to double. Our (finished) house provider will cover the costs, but we are still wondering how such a major change came about. Do I need to worry about the insulation of the house?