Today the foundation slab was done....busy busy
1: Noon Noon
2: Picture Evening

--> How much longer until the basement ceiling is done?

 

Sebastian79

2015-11-27 05:53:21
  • #2
What is the purpose of the KG pipes?
 

merlin83

2015-11-27 06:56:18
  • #3
KG? Probably wastewater.
 

Sebastian79

2015-11-27 06:58:56
  • #4
You do have a basement, don't you?
 

merlin83

2015-11-27 07:31:28
  • #5

Yeah, so basement-level pipes? No idea, that’s how the architect planned it and I trust him.

Partly for the planned bathroom in the basement, washing and drying, fireplace condensate, heating condensate, etc.
 

EveundGerd

2015-11-27 20:31:59
  • #6


Did you watch?
 

Similar topics
27.02.2016Where to lay pipes for controlled residential ventilation in the top floor ceiling21
17.10.2017Additional bathroom through the builder or just laying pipes?10
26.09.2019Is it allowed to lay KG pipes in gravel?11
11.11.2021How to seal pipes or entire openings11

Oben