Similar to us: 6.50€ per started 1T€ raw construction sum Raw construction sum: 118€ per m³ gross volume results according to our plan: 1525m³ --> 180 T€ --> 1170 €
All good, I still find it somehow outrageous of the city to reap the full benefits from just a fraction of the work.
Sorry, that’s nonsense. The general contractor we’re building with told me 1500 as the maximum number. All based on experience from previous construction projects in the same city and roughly the same cost.
If your shell builder comes to you and the invoice is suddenly 40% higher than calculated, I’d like to see your face.
Besides, it’s not just about the number itself, we can afford that. It’s about the ratio.
By the way, I have already calculated the costs well. Last week I received the offer from the landscaping contractor for 62k for the exterior work. I think you can’t really plan more thoroughly than that. Therefore, I look forward to your scenario relatively calmly.