  • #1
Hello everyone, we have looked at a plot of land that we like. However, it has a 57 m long driveway. We are wondering what additional construction costs/connection fees we will incur. We want to build a semi-detached house there. Does anyone have any experience? Do you have to request an offer from every utility provider? What kind of assistance does the developer offer? Best regards from two beginners ;)
 

toxicmolotof

2016-06-26 14:09:24
  • #2
If the property is offered by a developer, they should also have a concept for how it is supposed to proceed, or maybe it is not a developer at all?

In addition to the usual incidental construction costs, also familiarize yourself with the topic of fire protection. Although this is regulated differently in the federal states, given the long driveway, I could imagine special measures regarding escape routes or access by the fire department (vehicles) including parking space.
 

Kaliz01

2016-06-26 14:21:16
  • #3
Hey, so the property is being offered by the real estate agent without any building commitment. We will find a developer ourselves. But it would be good to know what he does and what our task is.
 

toxicmolotof

2016-06-27 12:50:26
  • #4
Then you should not look for a developer, because they only build on the land they own.

You are looking for a general contractor/general planner/architect/prefabricated house builder or whatever, but not a developer.

And everything that is contractually agreed upon by content (for the agreed price) belongs to it.

What is not in the contract or the construction description is not owed.
 

ypg

2016-06-27 14:30:07
  • #5
The costs for 57 meters of supply lines are provided by the local suppliers [Stadt-, Wasserwerk, Telekom]. The paving and earthworks can be estimated for about 150-200 sqm or you can have a garden landscaper prepare an offer. The house construction company usually stays out of this, but can assist organizationally with the construction road.
 

Similar topics
23.03.2011Developer or architect?15
25.03.2012Land now - house construction next year23
09.07.2012Developer offer for single-family house - Are the construction costs acceptable?16
03.08.2012Contract Supplement to the Construction Contract by the Developer36
05.02.2014Costs/planning land, additional construction costs, turnkey, etc.27
14.01.2014Buy land let build dream house26
23.06.2014Developer charges heavily for replanning - justified?12
08.10.2014How do you search for a suitable property developer?30
06.01.2015First buy the plot, then calmly plan and build...?11
27.02.2015Construction project with a developer without an official building plan, is a down payment required?12
13.06.2015New construction with developer / construction drawing documents23
19.01.2018Clearing and preparation of land12
16.10.2016Construction ancillary costs not visible?14
14.07.2017What is the maximum cost my property can have?21
27.02.2019Plot of land including turnkey house - experiences?46
06.01.2020House purchase, prefabricated house from the developer with land10
13.10.2020Land available - ancillary construction costs, ancillary house costs, financing?34
27.02.2021Prefabricated house including land planned - financing45
14.08.2023Does the builder have to hand over the soil report?18
11.10.2023Small plot, small driveway - space needed to turn around43

Oben