So, I also don't like the slope to number 18, or rather it shouldn't stay like that.
The slope to the garage currently looks uncritical.
Am I correct in assuming that the new building will have a basement? That means the pit still needs to be expanded?
In general, you can calculate for yourself where you will need a retention system. Outer edge of the foundation slab + 1 m working space, and then slope off at 60 degrees. At the top, at least 1 m of soil should remain. If that doesn't fit, then a retention system is necessary.
Based on the site plan, I think it will be tight towards the street in the west and towards house number 18.
The slope to the garage currently looks uncritical.
Am I correct in assuming that the new building will have a basement? That means the pit still needs to be expanded?
In general, you can calculate for yourself where you will need a retention system. Outer edge of the foundation slab + 1 m working space, and then slope off at 60 degrees. At the top, at least 1 m of soil should remain. If that doesn't fit, then a retention system is necessary.
Based on the site plan, I think it will be tight towards the street in the west and towards house number 18.