Beginning of house construction - cladding has cracks

  • Erstellt am 2015-06-17 11:55:31

Sebastian79

2015-06-17 12:43:41
  • #1
Well, windows and interior plaster, since screed and everything following depends on it... I think that's quite a serious delay.
 

toxicmolotof

2015-06-17 12:46:50
  • #2
Again: How the BU manages that is his problem.

Shouldn't the windows already be in place? If the place is sealed, work can continue inside.
(Note: Tent)
 

Sebastian79

2015-06-17 12:59:39
  • #3
No, with the brick construction they go in later - they are mounted against the facing bricks.

And a tent doesn't help there - where there is nothing, there is nothing.

Definitely a horrible situation - keeping my fingers crossed for you. Our facing bricks are coming on Friday and I am already super excited!!
 

Similar topics
27.02.2015Burglary-proof windows?33
03.06.2014Interior design - windows14
16.01.2018Is an extra charge for colored windows realistic?19
18.06.2014Inspector defect identification, determination of window installation10
18.05.2016Help needed with window arrangement!32
27.05.2015Huge problem with condensation on the window34
20.12.2019Trefz window prices and experiences?14
26.01.2015Window between two rooms13
13.03.2015Opinions on window parapet height sought30
09.04.2015For porthole, special regulations? Window, single-family house 1.5 stories.18
22.04.2015Window, roller shutter, exterior plaster10
28.05.2015Round window - dissatisfied with the interior reveal16
27.05.2015Which roller shutters with a closed window, only glazing?13
15.10.2015Kitchen planning with deep windows43
16.09.2019Windows in new buildings: triple glazing with a green tint?21
26.06.2015Floor plan question, stairs, window, orientation12
07.09.2015Kniestock height 2-story windows eaves side14
24.09.2015Which windows and doors are recommended?21
26.11.2015Floor-level shower with nearby window13
10.11.2015Single-family house floor plan planned, we like the windows43

Oben