BBQ - Construction-accompanying Quality Control

  • Erstellt am 2023-03-29 22:43:11

Gregor_K

2023-10-08 22:35:01
  • #1
I have one more question. If my construction supervisor is on vacation, can I demand that the construction company also takes a week off until the [Abnahme] is declared? For example, [Abnahme Bewährung Decke] and [Kellerwände]?
 

WilderSueden

2023-10-09 08:43:35
  • #2
You can certainly demand that. And if your shell builder agrees to it, the crew will then be working on another construction site for at least a month. Maybe even longer. And you can also save yourself any discussions about a missed construction deadline if you, as the client, cause the delay.
 

11ant

2023-10-09 13:05:48
  • #3

Thanks for the saving idea, then I will just stop the clock, because I need to save time *ROTFL*

Your general contractor wants to have the acceptance of the reinforcement of basement walls and ceiling declared?
And your construction supervisor makes a contract with you that he does not fulfill with the reasoning of his vacation?
 

Allthewayup

2023-10-09 13:17:37
  • #4
How long beforehand did your construction supervisor know that an important acceptance was scheduled for this week? Did he receive a tentative schedule from you? So if he is already on vacation and this acceptance is scheduled for that week, then that is really unfortunate – and most of all for you. Then all you can do is take extensive photo documentation that your inspector can review, and if they find anything, you are still powerless. In short: such an overlap MUST NOT happen.
 

Gregor_K

2023-11-05 07:01:08
  • #5
By the way, everything went well regarding the acceptance. The construction supervisor was back in time and was able to carry out the acceptance.
 

Bauherr2023

2023-12-12 18:45:48
  • #6


Are there "actually" tips/tricks/focus areas for construction acceptance where you almost always find something, possibly not really obvious?

I also want to avoid that shortly before the acceptance appointment something is spruced up with an "anti-mold paint" or similar, or openings/coverings remain closed until I then years later.....
 