On Monday it was finally time, the skylights were delivered... They are not yet fully installed and sealed, but here is a preview of how the rooms will look:
In addition, sockets and lamps were installed in the basement, the acoustic ceiling was mounted on the ground floor, and the terrace was sealed on the attic floor: