How does it actually work with the basement if I decide to build a house, for example with a prefab house provider? Often you can also book a basement with this provider, then it will probably be planned completely with the house. But actually, this business area is outsourced anyway. However, if I now want to have the basement built separately (e.g. for cost reasons), how does the planning and construction work then, for example? Does the planning still be done by the prefab house provider to correctly place connections, stairs, windows, etc.? Or does the basement construction company take over completely? Thank you
 

Wastl

2015-05-06 10:47:22
  • #2
We commissioned the basement ourselves because it was cheaper.
Planning: The house builder provided the structural engineer's requirements and a ceiling plan (openings for electrical / water / stairs).
Interior finishing of the basement + basement stairs + screed in the basement, etc. we had to arrange all by ourselves. The house builder then specified where the chimney would go and where the house connections would be installed (or rather, we had informed the house builder / basement builder of this in advance).
At first, it looked like a huge saving – in the end, it was maybe €5000 but with a lot of stress and problems due to the different contractors and the additional work we had to organize ourselves,....
 

Dindin

2015-05-06 11:38:37
  • #3
We did buy our basement from the house provider, but they source their basements from one of the largest basement builders in Germany. Since they do not manufacture the basement themselves, we had a separate appointment with the basement builder (who had already received all the plans from the house building company) to discuss the details such as connections, etc. However, we had already done the preliminary planning of the basement (where which wall, door opening, and stairs) in advance with the architect of the house building company.
 

Bader

2015-05-06 15:36:53
  • #4
And what are the experiences when the basement was not purchased through the house provider?
 

Doc.Schnaggls

2015-05-07 12:11:27
  • #5
We also ordered our basement through the prefabricated house manufacturer. However, it was then built by a large basement construction company from Schramberg.

It was important to us to have only one contact person and not be passed back and forth between two companies in the event of damage.

As we learned during the basement construction, there are also different quality standards underlying basement construction.

Our house manufacturer generally orders the highest quality level, which may already offset the additional cost compared to private commissioning.
 

Bautraum2015

2015-05-07 14:42:43
  • #6
May I ask a basement question here? We are considering building a raised basement about 50 cm above ground level. Does anyone know the costs compared to a normal basement? We need a white or black tank anyway because of groundwater at a depth of 5m... that means with a raised basement we don’t save on a WW.
 

Similar topics
15.03.2013Gas/electricity connection, how can connections be installed and where13
26.10.2013Planning/Architect, possible execution by "prefabricated house providers"21
17.01.2015Multimedia and Wi-Fi and connections22
06.01.2015Where to place the staircase? Attic conversion hip-roof bungalow19
08.01.2018Stairs in the hallway, the floor plan is actually already done :o(20
07.03.2015What should be considered when designing stairs / differences in the winding?22
26.06.2015Floor plan question, stairs, window, orientation12
27.08.20152 full floors, passage to garage, utility room under stairs25
11.12.2015Question about floor plan, especially stairs13
15.02.2016necessary staircase23
02.05.2016Staircase floor plan design, tread and stringer21
27.01.2017Price-performance comparison: Which is the best prefabricated house provider?16
20.06.2017Is a high basement the golden middle way?23
27.06.2018Prefabricated house provider with electrical installation as own work14
22.08.2019Who are the "most affordable & good" prefabricated house providers?13
09.10.2019Looking for affordable & good prefab house providers. (lower budget)62
11.10.2019Connection box in the wall - What kind of connections are these?13
08.03.2020Connections for electricity etc. for front yard and garden23
13.03.2021Opinion on various prefabricated house providers desired68
23.05.2021General contractor / prefabricated house provider with an existing BG (HOAI Phase 4)27

Oben