Peanuts74
2016-04-25 07:27:04
- #1
Without a basement, that should of course be enough. But do yourselves the favor not to store the excavation material on the side depending on the soil condition, as is often offered. Have the stuff taken away immediately if it is not suitable for backfilling, otherwise the excavator will have to come twice just for that. Backfill sand costs practically almost nothing (with us about 70-80 € per truck), without a basement you will need max. 2-3.