which energy standard is being built

  • Erstellt am 2015-02-07 15:53:31

ypg

2015-02-11 12:49:10
  • #1


Hm, I think wrote something like that in another thread, that it should be like that from 2015 on -> expert ... maybe he will comment here again
 

Sebastian79

2015-02-11 13:19:32
  • #2
No, it has been the case since June 2014 that an expert must be present at the KFW70 house. I didn’t want to believe it at first, but according to the KFW page, that’s how it is...

Apparently, no one messes around with me there - I don’t care either, I have the confirmations and receive all the proofs...
 

toxicmolotof

2015-02-11 13:24:57
  • #3
- I think I'm right, but I wouldn't bet a euro on it.

I'm on a break right now and will take another look at the conditions of the KFW shortly.

In my opinion, it is as Lexmaul writes. Something has changed with the brand new programs for the new Energy Saving Ordinance.

The confirmation for KFW70 (old) was just a formality. And with KFW70 (new), they wanted to achieve better control/quality.

I'll get back to you.
 

Bauexperte

2015-02-12 10:19:33
  • #4
Hello Tox,


No, nothing has changed regarding KfW 70; a certified expert has always had to fill out the corresponding forms. Furthermore, only from KfW 55 on do external auditors have to accompany a construction project.

Rhenish greetings
 

Sebastian79

2015-02-12 10:26:50
  • #5
However, the following is stated in the technical data sheet (and this applies to all KFW buildings):

− Development and planning implementation of an overall energy concept for structural thermal insulation and energy-related building services within the framework of the efficiency house calculation (if necessary, consultation on implementation options).
− Planning for minimizing thermal bridges (thermal bridge concept) and building airtightness (airtightness concept).
− Checking the necessity of ventilation measures (e.g., applying DIN 1946-6) and informing the builder about the results. The builder is responsible for initiating the implementation of ventilation measures.
− Confirming the planned energy level on the KfW form “Bestätigung zum Antrag (BZA)“.
− Participating in the tendering or obtaining of offers as well as checking the offers for compliance with the scope and quality of the planned energy measures.
− Before execution of plastering work or applying later claddings, conducting at least one site inspection to check the implementation of energetically relevant, especially later inaccessible building components (such as thermal protection building component structure) as well as the implementation of the thermal bridge concept, airtightness concept, and system parts.
− Checking the implementation of ventilation measures (if carried out).
− Checking the execution of an airtightness test.
− Checking the installed materials, products, and components on the building envelope and energy-related building services for compliance with the planned energy measures according to the efficiency house calculation.
− Communicating the parameters from the energy demand calculation for the heating system (and if applicable the solar thermal system) to the heating installer for implementation. Checking the proof of hydraulic balancing and system regulation (if applicable for heating and ventilation systems). Checking the handover of the energy-related building services (if necessary with additional technical instruction).
− Documenting the energy specialist planning and the supervision of the construction work.

There is no longer any distinction made between the individual standards at all – and now?
 

Bauexperte

2015-02-12 10:29:54
  • #6


we could now discuss at length or I could explain every sentence from the technical sheet to you based on common practice. I'll make it easier: You are right and I rest easy and we continue working as before

Rhenish regards
 

Similar topics
08.12.2015Construction costs for KFW70 house with basement turnkey15
10.05.2012Heating costs per year KfW55 - KfW70, building decision heating11
07.11.2013KfW70 in 2 variants ... help wanted!10
13.08.2013Cost estimate - simple single-family house according to kfW7030
30.09.2013KFW70 Calculation + Hot Water Storage13
28.09.2013With or without KfW70? How much additional cost with KfW70?11
29.01.2014Kfw70 with poroton and utility water WP + gas + decentralized ventilation13
05.08.2014New single-family house (KFW70)/aerated concrete vs. sand-lime brick/what to use?71
14.10.2014KfW70 with gas condensing boiler and solar is definitely not possible21
18.04.2015House construction, KFW70, approx. 150m², which heating? Gas/air-water heat pump?36
30.04.2015KFW70 with gas-solar heating65
01.10.2015BlowerDoor test mandatory for ventilation system and KfW7016
08.10.2015KfW70 only with heat pump now?26
16.12.2015Is KfW55 worth it instead of KfW70 with an additional cost?16
08.01.2016Assessment of heating concept KfW7025
02.02.2017Construction costs kfw70 vs. kfw55 vs. kfw4030
05.04.2016Is the KfW70 application still possible?14
24.04.2016KFW70 with gas condensing boiler + solar hot water + chimney10
23.05.2016Double glazing at KFW70???12
30.07.2021Are energy consultant costs realistic?16

Oben