kati1337
2020-06-04 19:42:37
- #1
We have received the construction schedule from the general contractor and now know when the handover with the Blower Door Test is planned. However, the letter stated that the new building will be in a damp condition at handover, and that special attention must be paid to the moisture before installing the kitchen. Now we are wondering what we need to factor in. So we are building over the summer, with completion in September. How long do we have to wait before we can have the kitchen installed? And how long would you wait / did you wait before moving in? We do not want to risk mold, but also do not want to pay rent unnecessarily for too long.