SebastianLiesa
2021-02-14 10:23:25
- #1
We have now been offered the following configuration from the general contractor for the KFW55 wall construction: 240mm Poroton (T8-filled), 120mm mineral facade insulation, 10mm air gap, 115mm clinker
I am surprised that the Poroton block still needs to be filled - what do you think about that?
I am surprised that the Poroton block still needs to be filled - what do you think about that?