There was a price difference of €30,000. Plus more services. Why they are cheaper I can only say once we have the complete offer.
Apart from the fact that I simply lack belief here – without knowing who the other provider is – such a difference, with comparable equipment, can never occur without leaving out services.
I had understood that it is technically not possible to install the BluMartin.
No, it simply depends on the respective supply contracts. Heinz von Heiden does not offer BluMartin and therefore cannot offer the system cost-effectively. And because they cannot do that, they also do not offer it.
In the end, they build one of their bungalows for us and shift the walls so that the bungalow of the other company comes out. (We only care about the floor plan) The only difference I could see is the masonry. The more expensive company uses white aerated concrete and Heinz von Heiden 17.5 brick.
And Heinz von Heiden uses an ETICS instead.
Read the BB carefully. I hardly know a basic configuration that is so stripped down; they respond to the market with this and therefore, from my point of view, also have their justification for existence. Keep in mind, when compared to the competition, if you go all out, they are – again because of their concept – significantly more expensive than supposedly high-priced providers.
That they offer more services than others – as a standard – I consider wishful thinking.
Rhenish greetings